Precision earthmoving and marine civil expertise in the Pilbara

Next Level Earthmoving Group is a family owned and Port Hedland based civil construction and earthmoving business delivering precision-driven solutions across complex marine civil projects, seawall construction, and detailed earthworks . Since 2023, we've built strong local expertise in tidal environments, serving Tier 1 and Tier 2 contractors throughout Western Australia.

Contact us

Ready to take your project to the next level?

Get in touch with our team today to learn how we can deliver precision earthmoving solutions for your next project.

About us

A family-owned and operated civil construction and earthworks company based in Port Hedland, Next Level Earthmoving Group specialises in the construction of rock sea walls, marine sediment and underwater rock removal, detailed earthworks and installation of various drainage systems. 


Our team is dedicated to delivering high-quality and reliable solutions for all your civil construction and earthmoving needs.


Our fleet

Our skilled workforce and specialist heavy machinery fleet deliver efficient, high-quality outcomes across all project stages, from design through to completion.

  • 14T Excavators with GPS
  • 35T Excavators with GPS
  • 50T Excavators with GPS
  • 75T Long Reach Excavator with GPS
  • CAT 140M Graders with GPS
  • D6 Dozer with GPS
  • 40T Articulated Dump Trucks (ADT)
  • 6-Wheel Water Cart
  • Posi-Track
  • Additional equipment available as required

Why choose Next Level Earthmoving

We're specialists in complex marine civil projects with precision capability in tidal and coastal conditions. We manage multiple long-term projects simultaneously whilst maintaining strong Tier 1 and Tier 2 contractor relationships.

Current & Past Projects

Based in Port Hedland, we have delivered and continue to deliver services to various Tier 1 & 2 contractors Western Australia-wide, delivering expertise across all major infrastructure and civil projects including;



  • Port Hedland Spoilbank Marina (2023-2024); Pilbara Ports & MGN Civil
  • Lumsden Point Causeway & Seawall Construction (2024-2025); Pilbara Ports & MGN Civil
  • Inner Harbour Revetment Works (2025 - current); Pilbara Ports & MGN Civil
  • Lumsden Wharves Development (2025 - current); Pilbara Ports & Acciona Construction
  • JD Hardie Adventure Park (2026) - Byblos Construction
  • PDP2 BHP Early Civil Works (2026); Hicks Civil & Mining
  • Geraldton Tug Harbour Redevelopment (commencing late 2026); Mid West Ports & MGN Civil